In May 2016 Burlington Electric Department released a District Heating RFI. Here is a link to the information about the RFI.

In August 2014 we were invited to discuss the community energy service on public access channel 17:  http://www.cctv.org/watch-tv/programs/burlington-community-energy-system

In April 2014, a second feasibility study was completed by Ever-Green Energy of St. Paul, MN. Here are links to that study.

This is the link to download the new (2014) Ever-Green Energy feasibility study https://ever-greenenergy.sharefile.com/d/s23dfa3b4a06425b8

This is the link to download the new (2014) feasibility study presentation: https://ever-greenenergy.sharefile.com/d/sd5a8a1b0d9142888

This is the link to the Burlington Free Press article from April 20, 2014: Burlington (again) eyes a harvest of heat from McNeil

The BURDES Committee completed a Clean Energy Development Fund grant on September 1, 2011 and submitted a report which summarizes our status at that time. The report includes two engineering studies and a short status update. Here is the CEDF final report: CEDF Final Report

The Evergreen Energy feasibility study was summarized in this report released in May, 2011: Burlington Renewable District Heating Technical Feasibility Report


 Here is a link to the public presentation of the Ever-Green Energy final report: http://www.cctv.org/node/106141

Here is a link to a Burlington Free Press article about using the McNeil Station for district heating:   http://www.burlingtonfreepress.com/article/20110522/GREEN01/105220305/Feeling-heat-Wood-burning-power-plant-could-send-more-heat-our-way